Meetings
2012-10-01ROBUH, RO
47th CIML Meeting — Resolutions (EN)
2012-10-01 → 2012-10-05 · ROBUH, RO
Agenda
| Item | Title | Outcome |
|---|---|---|
| 4 | 1 General report on BIML activities | Discussed |
| 6 | 1 Approval of the 2011 accounts | Adopted |
| 8 | 1 Report on the cooperation with the BIPM | Discussed |
| 9 | 1 Proposals for amending the Directives for OIML technical work | Discussed |
| 9.2 | 1 Revision of OIML V1 International vocabulary of terms in legal metrology | Discussed |
| 9.3 | 1 Approval of the draft revision of OIML R 126 Evidential breath analyzers | Adopted |
| 9.3.3 | Agenda item 9.3.3 | Resolved |
| 9.3.4 | Agenda item 9.3.4 | Resolved |
| 9.4 | 2 Amendment to OIML B 10 | Discussed |
| 10 | 1 Review of the draft agenda for the 14th Conference | Discussed |
| 14 | 1 48th CIML Meeting (2013) | Discussed |
Decisions (26)
CIML-2012/1approves
2012Approval of the minutes of the 46th CIML Meeting
Approves the minutes of the 46th CIML Meeting with the following amendment:
On page 24, section 3.2, first line of the final paragraph, replace "her husband" with: "Mr. Lagauterie".
2012-10-01
CIML-2012/2notes
2012General report by the CIML President
The Committee, Notes the report given by its President.
2012-10-01
CIML-2012/3notes
2012Presentations by the candidates for CIML first Vice-President
Notes the report given by the BIML Director.
2012-10-01
CIML-2012/4welcomes
2012BIML activities
Welcomes Gambia, Liberia, Malawi, Mauritania, Namibia, Nigeria and Sierra Leone as new Corresponding Members.
2012-10-01
CIML-2012/5approves
2012Member States and Corresponding Members
Approves the 2011 accounts, and
2012-10-01
CIML-2012/6instructs
2012Financial matters
Instructs its President to submit the draft to the 14th Conference for adoption.
2012-10-01
CIML-2012/7approves
2012Report on Developing Countries
Approves the BIML Director's proposal to allocate funding to support the OIML activities aimed specifically at developing countries,
2012-10-01
CIML-2012/8approves
2012Liaisons
Approves the BIML Director's proposal for policies and rules for the reimbursement of travel expenses incurred by its Members of Honor and invited guests to OIML Conferences, CIML Meetings and other legal metrology related events,
2012-10-01
CIML-2012/9notes
2012Technical activities
Notes the report given by the BIML Director,
Encourages the BIML to continue its efforts to recover outstanding arrears of its Member States and Corresponding Members,
2012-10-01
CIML-2012/10approves
2012Preparation of the 14th Conference
Approves this budget, and
2012-10-01
CIML-2012/11notes
2012Review of the Resolutions of the 14th Conference
Notes the report on developing countries given by the BIML.
2012-10-01
CIML-2012/11athanks
2012Thanks its President and the BIML Director for the establishment of regular working contacts
Thanks its President and the BIML Director for the establishment of regular working contacts between the BIPM and the BIML Directors and staff,
Discharges its President of presenting a report to the 14th Conference,
2012-10-01
CIML-2012/12confirms
2012Election of the CIML first Vice-President
Confirms that the rules set out in OIML B 6 shall only apply to the development, revision or amendment of OIML Basic Publications if the CIML so decides for a particular Basic Publication.
2012-10-01
CIML-2012/13confirms
2012Awards
Confirms that Corresponding Members may participate in the work of OIML Technical Committees, Subcommittees and Project Groups as Observing members (O-members) without any payment of additional fees.
2012-10-01
CIML-2012/14thanks
2012Future meetings
Thanks the ad hoc working group chaired by its second Vice-President,
2012-10-01
CIML-2012/15approves
2012Vote on Meeting Resolutions
Approves as a new work project under TC 17/SC 7 Breath testers a revision of R 126:2012 Evidential breath analyzers.
2012-10-01
CIML-2012/16approves
2012Approves the following Draft Publications: - Revision of OIML D1 Considerations for a law
Approves the following Draft Publications:
- Revision of OIML D1 Considerations for a law on metrology,
- Revision of OIML R 46 Electrical energy meters - Part 1: Metrological and technical requirements and Part 2: Metrological controls and performance tests,
- Revision of OIML R 106-2 Automatic rail weighbridges - Part 2: Test report format.
2012-10-01
CIML-2012/17approves
2012Items for approval
Approves the development of a new OIML Document General requirements for the program of reference material certification, as a new work project for TC 3/SC 3 Reference materials.
2012-10-01
CIML-2012/18approves
2012Items for approval
Approves as a new work project under TC 8/SC 7 Gas metering an amendment to R 137:2012 Gas meters.
2012-10-01
CIML-2012/19resolves
2012Resolves: The draft revision of OIML R 126 Evidential breath analyzers is approved.
Resolves:
The draft revision of OIML R 126 Evidential breath analyzers is approved.
2012-10-01
CIML-2012/20approves
2012Approves the proposal of the BIML for combining or withdrawing the projects as follows
Approves the proposal of the BIML for combining or withdrawing the projects as follows: (a) Projects to be cancelled after combination with another project:
|===
| Project | Title | Becomes part of
| TC3/p1 | Revision of R34Accuracy classes of measuring instruments | TC3/SC1/p1
| TC3/p2 | Revision of D3Legal qualification of measuring instruments | TC3/SC1/p1
| TC3/p5 | Revision of R42Metal stamps for verification officers | TC3/SC1/p1
| TC3/SC1/p2 | Revision of D20Initial and subsequent verification of measuring instruments and processes | TC3/SC1/p1
| TC6/p4 | Methods for determining the quantity of product in prepackages | TC6/p3
| TC10/SC2/p3 | Revision of R109Pressure gauges and vacuum gauges with elastic sensing instruments(standard instruments) | TC10/SC2/p2
| TC16/SC4/p2 | FTIR(Fourier transform infrared)spectrometers for measurement of air pollutants | TC16/SC4/p3
| TC17/SC7/p2 | Test procedures and test report format for the evaluation of portable breath testers used in open air | TC17/SC7/p1
| TC18/SC4/p2 | Electrocardioscopes-metrological characteristics-methods and means for verification | TC18/SC4/p4
| TC18/SC4/p3 | Digital electrocardiographs and electrocardioscopes-metrological characteristics-methods and means for verification | TC18/SC4/p4
| TC18/SC4/p5 | Analyzing electrocardiographs.Metrological requirements.Methods and means of verification | TC18/SC4/p4
|===
<div align="center">
(b) Projects to be renamed:
</div>
|===
| Project | Old title | New title
| TC3/SC1/p1(US) | Revision of D19Pattern evaluation and pattern approval | Combined revision of D19 and D20 incorporating elements of R34
| TC10/SC2/p2 | Revision of R101Indicating and recording pressure gauges, vacuum gauges and pressure-vacuum gauges with elastic sensing instruments(ordinary instruments) | Combined revision of R101 and R109
| TC16/SC4/p3 | Revision of D22(incorporating p2)Guide to portable instruments for assessing airborne pollutants arising from hazardous wastes | To be decided
| TC18/SC4/p4 | Revision of R90Electrocardiographs | Revision of R90-Electrocardiographs,electrocardioscopes and electrocardioanalysers.Metrological characteristics.Method and equipment for verification
|===
(c) Projects to be cancelled:
TC 13/p 2: Revision of R 103 Measuring instrumentation for human response to vibration,
TC 13/p 4: Revision of R 104 Pure-tone audiometers,
TC 13/p 5: Combined revision of R 58 Sound level meters and R 88 Integrating averaging sound level meters,
TC 18/SC 4/p 1: Electrodes for electrocardiographs and electroencephalographs methods and means for verification.
2012-10-01
CIML-2012/21decides
2012Decides that the CIML shall proceed to vote on the Amendment to OIML B
Decides that the CIML shall proceed to vote on the Amendment to OIML B 10:2012 in the current meeting under Agenda item 9.4.3.
2012-10-01
CIML-2012/22approves
2012Approves the Draft Amendment to OIML B 10.
Approves the Draft Amendment to OIML B 10.
2012-10-01
CIML-2012/23approves
2012Approves the following text as the OIML statement on the new SI to be
Approves the following text as the OIML statement on the new SI to be submitted to the BIPM in response to Resolution 1 (2011) of the CGPM:
"The OIML supports the CGPM's intention to revise the SI in order that it will continue to meet the needs of science, technology, and commerce in the 21st century.
From the inquiry amongst the OIML Technical Committees TC2, TC9, TC9/SC3 and TC11, and the CIML Members, it is concluded that the new SI definitions are considered to have little to no impact on routine measurements of time, length, luminous intensity, electric current, temperature, amount of substance, and related derived SI quantities. A potential impact may be on accurate mass measurements using class E weights according to OIML R 111. The OIML considers the careful adherence to the 2010 recommendations of the CCM as fundamental for the redefinition of the kilogram in order to avoid potential negative impact on routine mass measurements.
The OIML supports the intention of the CGPM to further improve formulations for the definitions of the SI base units so that the new SI remains understandable to all those who need it."
2012-10-01
CIML-2012/24notes
2012Noting the procedure for the selection of candidates to a vacant Vice-President post in
Noting the procedure for the selection of candidates to a vacant Vice-President post in B 14,
2012-10-01
CIML-2012/25thanks
2012Thanks the Vietnamese delegation for the presentation on the venue of its 48th meeting.
Thanks the Vietnamese delegation for the presentation on the venue of its 48th meeting.
2012-10-01