Skip to content
Decisions
CIML/2012/202012-10-01

Approves the proposal of the BIML for combining or withdrawing the projects as follows

Agenda item 20
URNurn:oiml:doc:ciml:resolution:2012-20

Actions

  • Approves
    Approves the proposal of the BIML for combining or withdrawing the projects as follows: (a) Projects to be cancelled after combination with another project: |=== | Project | Title | Becomes part of | TC3/p1 | Revision of R34Accuracy classes of measuring instruments | TC3/SC1/p1 | TC3/p2 | Revision of D3Legal qualification of measuring instruments | TC3/SC1/p1 | TC3/p5 | Revision of R42Metal stamps for verification officers | TC3/SC1/p1 | TC3/SC1/p2 | Revision of D20Initial and subsequent verification of measuring instruments and processes | TC3/SC1/p1 | TC6/p4 | Methods for determining the quantity of product in prepackages | TC6/p3 | TC10/SC2/p3 | Revision of R109Pressure gauges and vacuum gauges with elastic sensing instruments(standard instruments) | TC10/SC2/p2 | TC16/SC4/p2 | FTIR(Fourier transform infrared)spectrometers for measurement of air pollutants | TC16/SC4/p3 | TC17/SC7/p2 | Test procedures and test report format for the evaluation of portable breath testers used in open air | TC17/SC7/p1 | TC18/SC4/p2 | Electrocardioscopes-metrological characteristics-methods and means for verification | TC18/SC4/p4 | TC18/SC4/p3 | Digital electrocardiographs and electrocardioscopes-metrological characteristics-methods and means for verification | TC18/SC4/p4 | TC18/SC4/p5 | Analyzing electrocardiographs.Metrological requirements.Methods and means of verification | TC18/SC4/p4 |=== <div align="center"> (b) Projects to be renamed: </div> |=== | Project | Old title | New title | TC3/SC1/p1(US) | Revision of D19Pattern evaluation and pattern approval | Combined revision of D19 and D20 incorporating elements of R34 | TC10/SC2/p2 | Revision of R101Indicating and recording pressure gauges, vacuum gauges and pressure-vacuum gauges with elastic sensing instruments(ordinary instruments) | Combined revision of R101 and R109 | TC16/SC4/p3 | Revision of D22(incorporating p2)Guide to portable instruments for assessing airborne pollutants arising from hazardous wastes | To be decided | TC18/SC4/p4 | Revision of R90Electrocardiographs | Revision of R90-Electrocardiographs,electrocardioscopes and electrocardioanalysers.Metrological characteristics.Method and equipment for verification |=== (c) Projects to be cancelled: TC 13/p 2: Revision of R 103 Measuring instrumentation for human response to vibration, TC 13/p 4: Revision of R 104 Pure-tone audiometers, TC 13/p 5: Combined revision of R 58 Sound level meters and R 88 Integrating averaging sound level meters, TC 18/SC 4/p 1: Electrodes for electrocardiographs and electroencephalographs methods and means for verification.

Dates

  • Decided:2012-10-01